A tender for the continuation of designing and rebuilding the S8 road, section Powązkowska - Marki (Piłsudskiego Street). Stage 2, section Powązkowska junction - Modlińska junction
Applications may be submitted till 9th January 2012. The date of project accomplishment is 27 months from the date of concluding the agreement.

 The order covers in particular:

- reception of cross section of the expressway at the segment of "Powązkowska" junction

- "Wisłostrada" junction with two one-way pavements (each one with three lanes) and an emergency lane together with the construction or renovation of engineering objects,

- reception of cross section of the expressway at the segment of "Wisłostrada" junction

- "Modlińska" junction with two one-way pavements (each one with 2 lanes) without an emergency lane with separated roads of common distribution at the section of "Wisłostrada" junction

- "Modlińska" - reconstruction of the object over the Vistula River that is the Grota-Roweckiego Bridge

- making it possible to construct 5 lanes in each direction (two for the S road and three for local traffic), adjusting to the current traffic of the Ministry of Transport and Maritime Economy regulation, and adjustment to the pedestrian and bicycle traffic,

- rebuilding of junctions: the segment of "Powązkowska" junction: rebuilding of the crossroads with traffic lights with the renovation of flyovers, strengthening/rebuilding of the surface, the section of "Broniewskiego" junction: rebuilding of the crossroads with traffic lights together with the renovation of flyovers,

- strengthening/rebuilding of the surface, the segment of "Marymoncka" junction: construction and rebuilding of a one-lane link with the construction of an engineering object,

 strengthening/rebuilding of the surface of the remaining links and streets of the junction together with the renovation of engineering objects, the segment of "Wisłostrada" junction: rebuilding of links together with the rebuilding of engineering objects,

strengthening/rebuilding of the surface of the remaining links and streets of the junction together with the renovation of engineering objects, the segment of "Modlińska" junction: rebuilding of a one-lane link together with engineering objects,

- strengthening/rebuilding of the surface of the remaining links and streets of the junction together with the renovation or rebuilding of engineering objects, rebuilding of traffic lights,

- rebuilding of distributor roads linking the junctions of Trasa Armii Krajowej into collections of junctions: Powązkowska – Broniewskiego – Marymoncka and Wisłostrada - Modlińska including: strengthening/rebuilding of the surfaces of distributor roads with the correction of the route of the road in the region of links with main roads of the expressway and crossroads,

 

- construction and rebuilding of remaining roads:

- construction and rebuilding of pavements for pedestrians, routes for pedestrians and cyclists and cycle lanes together with ramps,

- construction and rebuilding of the technical infrastructure, that is the rebuilding of external facilities,

- construction of acoustic screens, - construction, rebuilding, and renovation of the remaining engineering objects,

- other rebuilding and demolitions,

- cutting down the existing greenery,

- planting the area with greenery.